1,000 square metresResin bound and hybrid surfaces laid around the footprint of the Great Pagoda as part of its refurbishment, and to park-wide footway systemsAddagrip Terrabase and KBI Flexipave Project navigationPreviousPrevious project:Legoland WindsorNextNext project:Eton College Berkshire